Case details
MESSERS:
CMA CGM LINE
VESSEL:
M/V:CMA CGM PALAIS ROYAL
PORT:
SHANGHAI
DATE:
On/around 8th-Mar-2021
DEPT: DECK
According to the owner's instructions, Shanghai Ocean Credence
Marine Service Co., Ltd 18workers were sent to Shanghai YangShan
phase 3 will be cargo hold Bay22and 26 normal cleaning, 15 workers
(medical isolation) aboard cleaning ,3 workers terminal
assistance, in order not to affect the loading and unloading of
containers, our company through a day and a night's work days,
completed the work ahead of time, ensure the normal order of the
ship sailing. The specific cleaning process is as follows:
ⅠENTRY PORT
The isolation workers of our company will arrive at the isolation
Hotel (Seafarer Hotel) at 17pm on October 31st,(flg,1).Nov.1st,At
22:30 at night, the seafarer hotel leaves (FLG.2), and arrives at
the No.1 gate of the dock at 23:00 (FLG.3.4.5), and at the No.2
gate of the dock at 23:10. At 23:20, the isolation vehicles wait
under the gangway of the ship, and at 23:40, our trucks loaded
with cleaning items wait at the dock(flg.8), because the ship has
just finished berthing(flg.9). Unable to communicate with the
ship, we had to wait on the dock.
ⅡBOARDING
We could not contact the ship when we contacted the agent,Finally,
at 01:30am on November 2, the gangway at the entrance of the
ladder was lowered, and our company's personnel boarded the ship
one after made protection. After the isolation personnel boarded
the ship(flg1...6), our dock assistance personnel drove the truck
to the gangway at 02:00 (flg7.8.9)and waited for the crane to lift
our cleaning tools and materials onto the ship. Quarantine
personnel are required to use mobile phones to communicate with
their helpers without contact or communication.
Ⅲ Bay26 Pollution Survey
At 02:30am.All 15 workers of our company boarded the ship.BAY26 is
empty and BAY22 is full. Communicate with the on-duty personnel on
board. All our staff will clean BAY26 and then coordinate with the
dock to unload BAY22 as soon as possible.After communicating with
the ship, they began to divide the work. Four people assisted in
transporting materials, and 11 people went down to the bottom of
BAY26 cargo hold for pollution survey(flg1..9).
Ⅳ Worked In The Bay 26
1.oil absorbent cotton clean
2.Sawdust clean
3.Detergent clean
4.used brush and rags to clean oil floor
At 03:00am Workers used oil absorbent cotton for oil
cleaning(flg1(1..3)), at 03:30am used sawdust for
cleaning(flg2(1...9)), at 05:45am used detergent and disinfectant
to clean the ground(flg3(1..3)), at 06:30 am used brush to
clean(flg4(1..4)), and at 07:30am then used rags and mop in the
second to clean the ground(flg4(1.2)).
Ⅴ After cleaning bilge floor and packing
At 08:35am.Floor cleaning finished(flg.1..7),then had breakfast,
at 09:35AM, packing completed,(flg.8.9) waiting for garbage
transfer, Bay26 cleaning finished. personnel take a short rest,
waiting for Bay22 container unloaded
ⅥBay22 Pollution Survey
At 11:00am,Bay22 is almost finished unloading, our personnel wait
in the bilge for the last container to be unloaded, and then
investigate the contamination as shown in the picture above
(FLG.1... 12).
Ⅶ Seal the leaking container with leak blocking material
1.Leaking container number information
2.Seal the leaking container with leak blocking material on board
3.Seal the leaking container with leak blocking material again in
the container yard
At 12:00,had lunch,after had a rest 1hours,at 13:00pm.Seal the
leaking container with leak blocking material on
board(flg1.2(1..3)),All the staff continue to clean Bay22. After
the cleaning work on the ship is finished, three dock assistance
staff will go to the container yard to seal the second time.At
21:30Seal the leaking container with leak blocking material again
in the container yard.
Ⅷ Worked in the Bay22
1.oil absorbent cotton cleaned
2.sawdust cleaned
3.Used detergent ,brush and other tools to clean
4.Handrail walkway was cleaned
At13:00pm, Bay22 started cleaning. At14:00pm, started cleaning
with oil absorbent cotton(flg1(1..3)),detergent and
sawdust(flg2(1...12)). At 14:30,the leaking container was
transferred to the container yard, At 17:00, the dirty oil and
sludge will be basically cleaned. At 17:30, dinner will be
started.At 18:00, rags will be used for cleaning.At19:00,Handrail
walkway was cleaned(flg4(1..4)).
Ⅸ After cleaned bilge floor and packing
1.After cleaned bilge floor
2.after cleaned parking
3.Garbage transfer to the truck
At20:00,The person in charge of the site of our company
communicated with the dock and transferred the garbage to the
truck of our company smoothly by using the gantry crane of the
dock(flg1..8).
Ⅹ Isolation hotel special bus delivery
At21:30,the quarantined personnel will be brought back to the
hotel by special bus and put under medical quarantine for 14
days(flg1..4) .All cleaning operations shall be completed and
inspected and approved by the ship's officer on duty; At22:00,
Bay22 and 26 starts normal loading.
Ⅺ Comparison before and after cleaning
1.before cleaning bilge well
2.after cleaning bilge well
Bilge wells comparison before and after cleaning
Bay 26 cargo hold comparison before and after cleaning
1.Before cleaning
2.After cleaning
Bottom of cargo hold comparison before and after cleaning in the
Bay26
Bay 22 cargo hold comparison before and after cleaning
1.before cleaning
2.After cleaning
Bottom of cargo hold comparison before and after cleaning in the
Bay 22